GBT 51296-2018 英文版 石油化工工程数字化交付标准.pdf

GBT 51296-2018 英文版 石油化工工程数字化交付标准.pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:37.5 M
标准类别:其他标准
资源ID:338454
下载资源

标准规范下载简介

GBT 51296-2018 英文版 石油化工工程数字化交付标准.pdf

Table C.0.l(continued)

C.o.2The general attributes describing the plant object class should meet the requirements of Table C02

高压旋喷桩试桩施工方案修编(南)Table C.0.2General attributes of theplant object cla

C.0.3The attributes describing the vessel should meet the requirements of Table C.0.3 Table C.0.3Attributes ofvessel

C.0.4The attributes describing the tray column should meet the requirements of Table C.0.4 Table C.0.4Attributes oftray column

Table C.0.4(continued)

Table C.0.5Attributes of shell and tube heat exchang

Table C.0.5(continued)

Table C.0.6Attributes of air cooled exchange

Table C.0.6(continued)

C.0.7The attributes describing power pumps should meet the requirements of Table C.0.7. TableC.0.7Attributes ofpowerpumps(centrifugal pumps)

Table C.0.7(continued

C.0.10The attributes describing the facilities of fire water system should meet the requirements Table C.o.10.

TableC.0.10Attributes ofthefacilities forfirewate

Table C.0.10(continued)

C.0.11 The attributes describing the piping should meet the requirements of Table C.0.11 Table C.o.1lAttributes of piping

C.0.12The attributes describing the safety relieving elements should meet the requirements of Table C.0.12

0.12The attributes describing the safety relieving elements should meet the requirements hle.0.12

Table C.0.12Attributes of safety relieving elements

0.13Attributesofpressure/differentialpressuretransm

Table C.0.13(continued)

C.0.14The attributes describing control valve should meet the requirements of Table C.0.14 Table C.0.14Attributes of control valve

Table C.0.14(continued)

C.0.15 The attributes describing the power transformer should meet the requirements of Table C.0.15.

C.0.15 The attributes describing the power transformer should meet the requirements of Table C.0.15.

0.15The attributes describing the power transformer should meet the requirements of Ta 15

Table C.0.15Attributes of power transformer

C.0.16The attributes describing the frame should meet the requirements of Table C.0.16. Table C.0.l6Attributes offrame

C.0.16Theattributesdescribingtheframe reouirementsol TableC.0.16 TableC.0.16Attributesofframe

C.0.17 The attributes describing buildings should meet the requirements of Table C.0.17 Table C.0.17Attributes of buildings

AppendixDTypicaldeliverycontentsofdocuments

D.0.1The delivery list of general engineering(AA)documents should meet the requirements of TahleD.O1

Table D.0.2

D.0.3The delivery list of static equipment design(AC)documents should meet the requirements of TableD.0.3

0.3The delivery list of static equipment design(AC)documents should meet the requirements hleD.0.3

Table D.0.3The delivery list of static equipment design(AC)documents

The deliverylist of rotaryequipment design(AD)docume

D.0.5Thedeliverylist olindusiriallurnacedesign(AE)documenls shouldmeeiiherequirementsol TableD.0.5

Table D.0.5The delivery list of industrial furnace design(AE)documents

Table D.0.5(continued)

0.7The delivery list of piping design(AG)documents should meet the requirements of Table D.O Table D.0.7The delivery list of piping design(AG)documents

Table D.0.7(continued

D.8Thedelivery listof instrument design(AH)documents should meet the requirements of Ta

Table D.0.8The delivery list of instrument design(AH

Table D.0.8(continued)

D.0.9The delivery list of electrical design (AJ) documents should meet the requirements D09

very list of electrical design (AJ) documents should meet the requirements of Table

Table D.0.9The delivery list of electrical design(AJ)document

Table D.0.9(continued)

le D.0.1l The delivery list of architectural design(AL)dd

D.0.12The delivery list of structural design (AM)documents should meet the requirements of TableD.0.12

0.12The delivery list of structural design(AM)documents should meet the requirements hleD.0.12

Table D.0.12The delivery list of structural design(AM)documents

D.0.13The deliverylistofHVAC design(AN)documents should meet the Table D.0.13

D.0.14The delivery list of laboratory analysis and measurement design(AP)documents should meet therequirements ofTableD.0.14

0.14The delivery list of laboratory analysis and measurement design(AP)documents should m reauirements ofTahleD.0.14

Table D.0.14The delivery list of laboratory analysis and measurement design(AP)documents

D.0.15The delivery list of water supply and drainage design (AQ)documents should meet the requirements ofTableD.0.15

D.0.15The delivery list of water supply and drainage design (AQ)documents should reauirementsofTableD.0.15

Table D.0.15The delivery list of water supply and drainage design(AQ)documents

e D.0.16The delivery list of fire fighting design(AR)doe

Table D.0.16(continued)

D.0.17The delivery list of prefabricated steel structure procurement(BA)documents shoulo reauirementsofTableD.o.17

Table D.0.17The delivery list of prefabricated steel structure procurement(BA)documents

e delivery list of static equipment procurement(BB)docur

D.0.19The delivery list ofrotary equipmentprocurement(BC)documents shouldmeetthe requirements of Table D.0.19.

Table D.0.19The delivery list of rotary equipment procurement(BC)documents

Table D.0.19(continued)

.20The delivery list of pipeline procurement(BD)docur

The delivery list ofinstrumentprocurement(BE)docume

.22The delivery listof electrical procurement(BF)docu)

D.0.24The delivery list of civil construction (CB) documents should meet the requirements of Table D.0.24

Table D. 0.24The delivery list of civil construction(CB

D.0.25The delivery list of equipment construction(CC)documents should meet the requirements of Table D.0.25

0.25The delivery list of equipment construction(CC)documents shouldmeet the requirements hleD.0.25

Table D.0.25The delivery list of equipment construction(CC)documents

0.0.26The delivery list of pipeline construction(CD)documents should meet the requir Tahle D 0 26

livery list of pipeline construction(CD)documents should meet the requirements of

able D.0.26The delivery list of pipeline construction(C

Table D.0.26(continued)

D.0.27Thedeliverylistof electricalconstruction(CE)documentsshouldmeettherequirements o) TahleD.0.27

D.0.28The delivery list of instrument construction(CF)documents should meet the requirements of TableD.0.28

D.0.28The delivery list of instrumentconstruction(CF)

DB14/T 2106.1-2020标准下载D.0.29The correlation between plant object class and document should mcet the requirements of TableD.0.29

Table D.0.29The correlation between plant obiect class and document

Table D.0.29(continued)

深圳华能小区风景林施工组织设计Table D.0.29(continued

Explanationofwordinginthisstandard

Explanationofwordinginthisstandard

©版权声明
相关文章