NFPA70-2008标准规范下载简介
NFPA70-2008美国国家电气规范(英文版).pdfService equipment
CoyiNatnaFieProectionssciat
NATIONAL ELECTRICAL CODE 2008 Edit101
TCWAN 0028—2021 机器人焊接培训基地建设规范.pdf08'Editior NATIONAL ELECTRICAL CODE
CopyrightNationalFireP
NATIONAL ELECTRICAL CODE 2008 Edit10r
Thermally protected (thermal protection
Thermally protected (thermal protection)
CopyriNatonalFireProtectionAssociation
NATIONAL ELECTRICAL CODE
Working space
dition ATIONAL ELECTRICAL CODE
Working space
NATIONAL ELECTRICAL CODE 200
Formal Interpretation
Formal Interpretation
2008Edition
tion:Is it intended that fixtures installed in suspended ceilings be subject to the requirements tXIofArticle410? a
IssueEdition:1981 Reference:410,PartN Date:QOctoher 1982
th No reprodu
Copyright 2007 All Rights Reserved NATIONAL FIRE PROTECTION ASSOCIATION
Formal Interpretation
Formal Interpretation
2008Edition
Question: Does Part II of Article 517 of the NEC apply to patient sleeping rooms of nursing homes or limited care facilities where patient care activities do not involve the use of electrical or electronic life support systems; or invasive procedures where patients are electrically connected to line connected electromedical devices? AnSWer:No
IssueEdition:1999 Reference:Article 517 IssueDate:August 1,2000 EffectiveDate:August 21,2000
NofrareReAr
Seguence ofEventsLeadingtoIssuance
Step l:CallforProposals
Stepl:CallforProposals
Proposed newDocument or new edition of an existing Document is entered into one of two yearly revision cy cles, and a Call for Proposals is published.
Step2:ReportonProposals (ROP)
Step2:ReportonProposals (ROP)
Step3:ReportonComments(ROC)
Step5:Standards CouncilIssuance
CommitteeMembershipClassifications
NECSCHEDULEFOR2011 (2010 World Safety Conference and Exposition)
Anyone may submit proposals to amend the 2oo8 Code. A sample form for this purpose may be obtaine Secretary of the Standards Council at NFPA headquarters, and a copy is included in this Code.
ay submit proposals to amend the 2008 Code.A sampleform for this purpose may be obtained from the of the Standards Council at NFPA headquarters, and a copy is included in this Code.
Method of Submitting a Proposal to Revise the National Electrical Code
nMarch2004
Aproposal torevisethe2oo8edition oftheNationalElectrical Codemust be submitted so thattheproposalis received at NFPA headquarters byNovember 7, 2008, as indicated in the time schedule for the 2011 National Electrical Code. Aproposal received after this date will be returned to the submitter.The proposalis to be sent to the Secretary of the Standards Council at NFPAHeadquarters, 1 Batterymarch Park, P.O.Box 9101, Quincy, MA 02169 7471 Each proposalmust includethefollowing:
Copyright National Fire Protection Association
FOR PROPOSALS FOR 2011 NATIONAL ELECTRICAL COD
5.Copyright Assignment
Signature (Required)
PARATE FORM FOR EACH PROPOSAL·NFPA FaX:
Ncenseend 0:41 MD
FOR PROPOSALS FOR 2011 NATIONAL ELECTRICAL COD
5.CopyrightAssignment
PARATE FORMFOR EACH PROPOSAL·NFPAFax:
Copyright National Fire Protection Association
Ncenseend 0:41 MD
FOR PROPOSALS FOR 2011 NATIONAL ELECTRICAL COD
5.CopyrightAssignment
PARATE FORMFOR EACH PROPOSAL·NFPAFax:
Copyright National Fire Protection Association
Ncenseend 0:41 MD
FOR PROPOSALS FOR 2011 NATIONAL ELECTRICAL COD
5.CopyrightAssignment
PARATE FORMFOR EACH PROPOSAL·NFPAFax:
Ncenseend 0:41 MD
Spleaseenroll measamemberofNFPAforthetermcheckedbelow.Activateall benefits,andship myMemberKit includingthe Benefits Guide,MemberDirectory,andother resourcestohelpmemakethe most of my NFPA membership. Please allow three to four weeks for the kit to arrive.
DB65T 3901-20016 水泥生产企业事故隐患排查技术规范.pdfPLEASE ANSWER THE FOLLOWING QUESTIONS:
Architect, Engineer, Consultant, Contractor (C17) Facilities Safety Officer (F14) Fire Chief, Other Fire Service (A11) Loss Control, Risk Manager (L11) Inspector, Building Official, Fire Marshal (Fo3) Owner, President, Manager,Administrator (C10) Other (please specify): (G11) TypeofOrganization (check one) Architecture, Engineering,Contracting (A14) Commercial Firm (Office, Retail, Lodging, Restaurant) (G13) Electrical Services, Installation (J11) Fire Service, Public and Private (AA1) Government (C12) Industrial Firm (Factory, Warehouse) (C11) Institutional (Health Care, Education, Detention,Museums) (B1 Insurance, Risk Management (B12) Utilities (G12) Other (please specify): (G11)
FpANewsFrom new standardsfor dry cleaningplants to warning equipmentfor ouseholdcarbonmonoxide,thismonthlyonlineupdatekeepsyouabreastof additions r changes that could impacthow you doyourwork.
io%DiscountsSavehundredsof dollars duringtheyear on NFPA meeting registration fees,publication and products and services sold in NFPA's catalog,
广州市华南南路二期工程第一标段内梅窿1号、2号大桥先后跨越梅窿水库施工组织设计otingRightsYourchancetohelpshapethefuture directionoffireprevention codes nd standards. bting rights go into ffect 180 days from the start of individual membership.
Join NFPA today!