SY/T 5190-2016 石油综合录井仪技术条件

SY/T 5190-2016 石油综合录井仪技术条件
仅供个人学习
反馈
标准编号:SY/T 5190-2016
文件类型:.pdf
资源大小:11.9M
标准类别:机械标准
资源ID:204262
下载资源

SY/T 5190-2016标准规范下载简介

SY/T 5190-2016 石油综合录井仪技术条件

SY/T 51902016

5.12Well depth measurement parameterstest 5.13Engineering and drilling fluids parameters test 5.14 Geological analysis parameters test . 5.15 Signal interface system test 5.16 Computer system test ·32 Rules of inspection .33 6.1 Delivery inspection .33 6.2 Type inspection .·33 6.3 Criterion rules. Marking, packaging, transport and storage *34 7.1 Product marking · 34 7.2 Packaging 7.3 Transport 54

CECS 558-2018-T 建筑工业化内装工程技术规程SY/T51902016

2Normativereferences

SY/T51902016

pressurization GB12955—2008Fireresistantdoorsets GB/T13384Generaltechnical requirements packaging of mechanical and electronic products

Compositionandclassificat

Composition and classi

3.2Unit classification

Requirements

Unit environmental con

4.2Vibration conditio

Instrumentpower supply,signal acquisition,gas processing and gas analysis unit do vibration test

SY/T 51902016

a)Frequencyrange:10Hz~50Hz b)Peakvalueacceleration:50m/s2. c) Time : 10min

43Shock condition

Instrumentpowersupply,signal acquisition,gas processing and gas analysis unit do vibration test a)Pulsewaveform:Halfsinewave. b)Duration : 11ms. c) Peak value acceleration : 50m/s?

4.4Noising condition

Noising shall heless than 60dBwithin the working area of the unit.

.5Powerrequirement

4.6Insulationreguirements

The insulation condition includes: a)Undertheworking condition,theresistance between the entire machine circuit and the unit shell shallbemorethan20MQ[500V(DC)]. b)Theunit shallhave the overload power failure protection.

4.7Cabin configuration

asfollow a) The cabin outer shell shall adopt steel structure. The cabin shall be provided with facilities to guarantee themain instrument from impact and

4.8.1Cabin's requirements

4.8.2Airpressureinthe cabin

Pressure withinthe cabin shall bekept at 50Pa 150Pa above atmosphere.If the inside and outside airpressuredifferencedecreasestobelow50Pa, alarmwillturnonandlastfor1min,following withthe automaticallyturned off of themain power.

4.8.3Flammablegasdetection

DetectionscopeshallcoverO 100%ofthe explosion lower limit,with theprecision of±2% Whenflammablegasdensityreachestherange20%~ 50%oftheexplosionlowerlimit,alarmsystem works.While as it raises tovalues above50%of the explosion lowerlimit,thehost power and airblower powerwillbeturnedoff automatically

4.8.4Smoke detection

When the faint gray smoke reaches 2.4% per meter, the host power and airblower power will be turned offautomatically

.8.5Emergency lights

The unit shall be equipped with the emergency lights. The emergency lighting system shall turn to emergency work condition automatically in 5s after the power supplywas shut off,and can work continuously no less than 20min when charged enough.

The unit shall be equipped with the emergency devices to shut off all the power supplymanually, with a lack function after the shutting off.

4.9Continuous running time

The whole unit shall be able to run continuously ess than 300h

4.10Gas analysis parameters

4.10.1Total natural gas detector

SY/T 51902016

4.11.1Depth Measurement parameters are as follow : a)Measurementrange:(0~9999.99)m b)Accuracy:±1cm/10m 4.11.2ROP Measurementrange:(0.10~999.99)min/m 4.11.3Hook height sensor Measurement parameters areas follow : a)Measurementrange:(0~50)m. b)Accuracy:±lcm/10m. 4.12 Engineering, drilling fluids parameters System parameters are shown in Table 1. 4.13Geology analysis parameters 4.13.1 Carbonatecontentdetector

Measurementparameters are as follow a)Measurementrange:0~100%. b) Accuracy : Full scale 2%

SY/T 51902016

Table1Engireeringand drillingfluidparameters

.132Shale densimeter

a)Measurementrange:(2.152.85)g/cm) b)Resolution:0.01g/cm3

sareasfollow: a)Wavelength:(350~365)nm b) Power : > 4w

4.14Signal interface system

4.15Computersystem

4.15Computersystem

4.15.2Computersystem software

4.15.3Dataacquisition software

4.15.4Dataprocessing software

4.15.5Databaseapplicationsoftware

SY/T 51902016

quickly ; d)The open database structure and the WITs interface shall be able to exchange data with other well site devices in ASCIl or LAS form.

4.15.6Dataoutput system

Dataoutputrequirements a)The system can provide the flexiblegraph and data format editiontool,and customize document, database and so on. b)Thesystemcanextractdatafromdifferent database,and customize colored plots with logging information,such asmaster log,gas evaluationplot,pressureevaluationplot,etc, and various data format. It can also output data from theprinter,plotter,document,database andsoon

Test methods

5.1Test equipment and guide sample

SY/T 51902016

5.2Environmentcondition

All test should be in 4.I prescribed conditions

5.3Vibration test

According to GB/T 2423.10 method for vibration test: a)Beforethetest,inspectionequipment performance. b)Instrument in no packingconditions fixed in thevibration on the stage,press 4.2 choosetest conditions, vibration test. c)After the test,usethetest systemfor thetest, instrument can work normally

5.4Impact test

AccordingtoGB/T2423.5—2008methodfor impacttest: a)Beforethe test,inspectionequipment performance; b)Instrument in no packing conditions fixed in impact device, choose test conditions by 4.3, impacttest. c)Afterthetest,usethetest systemforthetest. instrument can work normally

55 Nnise fesi

5.6Power test

5.7Insulation test

Test methods are as follow : a)By megohmmeter check the power circuit of enclosure of electrical insulation, the results should be conformed to the requirements in 4.6 a). b)According to theinstrumentrating,add joint load. When exceed the specified load, should cut off electricity automatically, and the results shall be conformed to the requirement in 4.6b)

Test methods are as follow : a)By megohmmeter check the power circuit of enclosure of electrical insulation, the results should be conformed to the requirements in 4.6 a). b)Accordingto the instrumentrating,add joint load. When exceed the specified load, should cut off electricity automatically, and the results shall be conformed to the requirement in 4.6 b)

5.8Cabin structurerequirements test

Test methods are as follow : a)Instrumentinthetertiarypavementorequivalent to earth road, gravel road under the condition of turbulencetest:at4okm/h,strokenot less than 60 km. After the test,the test system for its testing,instrument can work normally,the results should be conformed to the requirements in 4.7 a) . b)With visual method inspection equipment room outer and instrument host,the result should be conformed to the requirements in 4.7b). c)Thedetectionreportof rigging equipments should be conformed to the requirements in 4.7c)

Test methods are as follow : a)Instrumentinthetertiarypavementorequivalent to earth road, gravel road under the condition ofturbulencetest:at4okm/h.strokenotless than 60 km. After the test, the test system for its testing,instrument can work normally,the results should be conformed to the requirements in 4.7 a) . b)Withvisual method inspection equipmentroom outer and instrument host, the result should be conformed to the requirements in 4.7b). )Thedetectionreportofriggingequipments should be conformed to the requirements in 4.7c)

Inspectthecabinaccordingtotherequirements in GB3836.1,GB3836.5,GB3836.17,GB12955. The result should be conformedto the requirements in4.8.1

5.9.2Positivepressurecontrol test

Closethewindowsand thedoors,turnon themain power, and start the air blower.The main power shall be turned on only if the indoor and outdoor airpressure difference reaches predetermined value 150Pa.Then open the doors or shut down the airblowerto decreasethe indoor andoutdoor air pressure difference topredetermined value50Pa, the result shall be conformed to the requirements in 4.8.2.

5.9.3Flammablegas safety test

Connect the flammable gas detector head and the device containing standard flammable gas sample, furn on the standard gas valve,check the correctness of the sensor's display and set the explosion lower limitvalue.Dischargetheflammablegasnear the sensorhead,the result shall be conformed to the requirements in4.8.3when theflammablegas density achieves the predetermined value

5.9.4Smoke safetytest

In the smoke detector sensor probetest range, casting smokeaccordingto the standard requirements of the smoke,the results should be conformed to the requirements of the 4.8.4.

For emergency lighting devicebattery charging tothesaturation state,shutoffthemainpower supply,recording emergency lighting in shut off the main power supplymuch time can be transferred to emergency work state and continuous lighting time, the results shall be conformed to the requirements in 4.8.5.

5.9.6Emergencysafetytest

Pressdowntheemergencyswitchmanually and carry out the test under the normal working condition. The test result shall be conformed to the requirements in 4.8.6.

SY/T51902016

5.11 Gas analysis test

5.11.1Natural gas total analysis test

SY/T51902016

Input the mixed gas sample of 1% density of methane and 1%density of ethane.Record the voltagevalueA at twopeaks intersection point of methane and ethane aswell as thepeak voltage B of ethane.The separation degree R can becalculated accordingtoFormula (3),the result shall be conformed to the requirements in 4.10.2d)

SY/T 51902016

5.11.4H,S test

5.11.3CO,test

5.12Welldepthmeasurementparameters

Check the readings using the signal from the winch sensortest instrument,and the results shall be conformed to the requirements in 4.11.1 and 4.11.2.

Check thehook height using the signal from the winch sensor test instrument,and the results shall be conformed to the requirements in 4.11.3.

5.13.1Pumpstrokesrateandrotarytablesp

Check the pump stroke times and rotary speed value using the signal from the Pump impact and rotary speedsensortestinstrument,andtheresultsshallbe conformed to the requirements in Table 1

5.13.2Rotary table torque test

Test methods are as follow : a)Pressuretransfermethod:applyaconstant pressuretothepressuresensorbythepiston pressure meter, convert this pressure to the

SY/T 51902016

engineering value, then check its corresponding value,the result shall be conformed to the requirements in Table 1. )Electricity torque transfer method:implement test witha simulator, convert the currentto the engineering value,then check its corresponding value. The result shall 6e conformed to the reauirements in Table I.

engineering value, then check its corresponding value,the result shall be conformed to the requirements in Table 1. )Electricity torque transfer method:implement test with a simulator, convert the current to the engineering value,then check its corresponding value. The result shall 6e conformed to the requirements in Table 1.

5.13.3Standpipepressure,casingpressureand hookload test

5.13.3Standpipepressure,casingpressureand

Apply a constant pressure to the pressure senso bythepistonpressuremeter,convertthepressure to the engineering value,and the result shall be conformed to the requirements in Table .

5.13.4Drilling fluids level test

Placeasensorontheplanparalleltothetesting surface,theerrorbetweenthemeasureddistance and the standardized one should he conformed to the reauirements in Table l.

5.13.5Drilling fluids temperature test

Put the temperature sensor into the heater, and set different temperature respectively. The reading value and the standardized one shallhe conformed to the requirements inTable1.

5.13.6Drilling fluids density test

Put the sensor into a kind of solution with known density, the reading value shall he conformed to the requirementinTable

5.13.7Drillingfluidsconductivitytest

Measure the conductivity inseveralkinds ofNaC solutions with different conductivity through using the standardized conductive meterand conductive sensor simultaneously.The readingvalues shall he conformed to therequirements inTable1.

5.13.8Drilling fluids flow out test

The movementrange of the flow sensor's baffle 32

shall be conformed to the requirements in TableT

5.14Geological analysis parameters test

5.14.1Carbonate measurer test

5.14.2Shale densimeter test

Put it into the shale with:known density,the reading value should shallbe conformed to the requirements in 4.13.2.

5.14.3Fluorescenceanalyzertest

There shall he no fluorescence reflected when it is tested with the nonfluorescence samplewhile there shallbefluorescencewhentestedwiththeknown fluorescence sample,theresult shouldhe conformed to the requirements in 4.13.3.

There shall he no fluorescence reflected when it is tested with the nonfluorescence sample while there shallbefluorescencewhentestedwiththeknown fluorescencesample,theresult shouldhe conformed to the requirements in 4.13.3

5.15Signal interface system test

Connectthesensorandinterfacesystemcheck param resules should be consistent with 4.14

5.16Computersystemtest

5.16.1Computerhardwaretest

.16.2Computersystemsoftwaretest

6Rulesof inspection

6.1Deliveryinspection

Each set of theunits shall heinspected before

SY/T 51902016

leaving the factory.Only the units that have passed all related delivery inspection are qualified to lease thefactory. The items of delivery inspection arc listed in Table 2.

Table2Theitems of Instrumentinspection

6.2Type inspection

6.2.1Typeinspection condition

Type inspection shall be carried out in any of the followingsituations: a)Whenperformanceof theinstrumentisaffected by substantial changes in structure, technology and material,after the instrument is formally put into production. b)Periodic inspection shallbe carried out after50 sets have been accumulatively produced. )Whengreatdifferencesexistbetweentheresults of the delivery inspection and the previous type inspection. d)Whentypeinspectionis requestedbythe State Department of Quality and Technical

Type inspection shall be carried out in any of the following situations : a)Whenperformanceof the instrument isaffected by substantial changes in structure, technology and material,after the instrument is formally putintoproduction. b)Periodic inspection shall be carried out after50 sets have been accumulatively produced. c)Whengreatdifferencesexistbetweentheresults of the delivery inspection and the previous type inspection. d)When type inspection is requested bythe State Department of Quality andTechnical

Supervision

Supervision

6.2.2Itemsandrequirementsoftypeinspectic

Items and requirements of type inspection are showr linTable2,

6.2.3Randomsamplingofthetypeinspection

6.3Criterionrules

SY/T 51902016

6.3.2Type inspection

JGJ/T 40-2019 疗养院建筑设计标准Marking,packaging,transport and storage

7.2Packaging

7.2.1Packaging shallbeconformed to general

7.2.1Packaging shall be conformed togeneral specificationsforpackingof mechanical and electrical product in GB/T 13384

.2.1Packagingshallbeconformedtogener specificationsforpackingof mechanicalan electricalproduct inGB/T13384

73Transport

7.3.1Theproducts shallbefittovarious transportationmeans. 7.3.2During the transport,the products shall bekeptfromdamp,fiercevibration,shock, inversion and roll over. 7.3.3Theproductsshallnotbe transported togetherwiththeexplosive,flammableand corrosiveobjects.

SL 34-2013 水文站网规划技术导则7.4.1The products shall be stored in the dry, ventilated warehouse where there.is no harmful gas. 7.4.2Theproducts shall be checked every six months. 7.4.3The products shall be regularly cleaned and protectedfromtheerosionofrain,snowandsand.

©版权声明
相关文章