YBT 4264-2020 英文版 桥梁缆索钢丝用盘条.pdf

YBT 4264-2020 英文版 桥梁缆索钢丝用盘条.pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:2.7 M
标准类别:交通标准
资源ID:229789
下载资源

标准规范下载简介

YBT 4264-2020 英文版 桥梁缆索钢丝用盘条.pdf

ICS 77.140.60 IH44

YB/T4264—2020 ReplaceYB/T4264—2011

steel wire rod for bridge cable wi

JJF 1871-2020 磁电式转速传感器校准规范.pdfsteel wire rod for bridge cable wi

(Eng/ishTrans/ation)

ssuedbyNationa and People's Republic of China

abyNat People' China

YB/T42642020

YB/T42642020

irerodforbridgecablewir

is standardspecifies the designation,orderinginformation,dimension,shape,mass a ermissibletolerances,technicalrequirements,testmethods,inspectionrule,packaging rking and quality certificate of steel wirerod for bridge cablewire. is standard isapplicableto steel wire rodforbridgecablewire

2Normative references

le following referenceddocuments are indispensable for the applicationofthisdocument r dated references, onlythe edition cited applies. For undated references, the lates litionofthereferenceddocument(includinganyamendments)applies

YB/T42642020

3Designatior

4 Ordering Informatior

Contractsor orders for wire rodunder folTowing information: a) Standard number. b)Product name; c) Steel grade; d) Dimension; e)Mass(quantity); f) Delivery condition:

YB/T42642020

6.7 Microstructure

6.8 Grain size

6.9Surfacequality

or ears which maybe detrimental to its use.Indentation and Iocal bumps,pits, scratches, pockmarks are allowed,but the depth or height (calculated from actual dimension) must not exceed o.10mm. 6.9.2 Head and tail of wire rod with harmful defects shall be cut.The cross section of wire rod shall be free of shrink holes, layers or inclusions. 6.9.3The scale weight on wire rod surface shall not be greater than 7kg/t. The scale weight may not be inspected when its conformity is guaranteed by the supplier. 6.10Specialrequirements According to the purchaser' s requirement, the inspection of other items may be carried out upon agreement between the supplier and purchaser

According to the purchaser' s requirement, the inspection of other items may be carried out upon agreement between the supplier and purchaser

7 Test methods

Thetestitems,samplequantity,samplingmethodandIocationofeachbatchof wi ds shall be in accordance with Table 6.

DAT 35—2017《档案虫霉防治一般规则》tems, sample quantity,sampling method an

YB/T42642020

YB/T42642020

YB/T42642020

GB/T 51250-2017标准下载7.2 Scale inspection method

cales weight on samples(kg) X1000(k tal samples weight(kg)

©版权声明
相关文章